How much concrete do I need for a slab?
What you need
- Length and width of the slab
- The thickness you will pour
- The yield printed on the bag, if you use bagged mix
Step by step
Measure the length and width
Measure the area to be poured. For an L-shape, split it into rectangles and add the volumes.
Decide the thickness
Common slabs for paths and patios are about 100 mm (4 in). Heavier loads need more, and your design or local rules decide the number.
Convert to the same unit
Work in metres (thickness in metres) or in feet (thickness in feet), then multiply: length × width × thickness.
Add a waste allowance
Add 5 to 10 % for spillage, uneven ground and a slightly deeper pour.
Convert to what you will order
Multiply cubic metres by 1.308 for cubic yards, or divide cubic feet by 27. For bagged mix, divide the volume by the yield printed on one bag.
Worked example (metric)
A 4 m × 3 m slab, 100 mm thick: 4 × 3 × 0.1 = 1.2 m³. With 10 % waste, order about 1.3 m³.
Worked example (US units)
A 13 ft × 10 ft slab, 4 in thick: 13 × 10 × 0.333 = 43.3 cu ft = 1.6 cu yd. With 10 % waste, order about 1.8 cu yd.
Do it with Metre
Site calculator Pro
- Measure the length and width of the slab with the Area tool, or tap its corners.
- Open the concrete calculator and enter the thickness.
- Metre gives the volume in m³ (or cubic yards) and the number of bags.
The site calculator, with concrete, tiles, stairs and slope, is part of Metre Pro. The formula above works with any tape.
iPhone and iPad, iOS 17 or later. Get Metre on the App Store.
How accurate is this?
Concrete volumes are estimates. Ground that is not flat, edge forms and spillage change the amount, and concrete cannot be returned, so round up.
Measurements made with a phone are estimates. Before you cut, order or build, confirm critical dimensions with a physical tape.
Questions people ask
How do I calculate cubic metres of concrete?
Multiply length by width by thickness, all in metres. A 4 m × 3 m slab 0.1 m thick is 1.2 m³.
How do I convert m³ to cubic yards?
Multiply by 1.308. One cubic yard is 27 cubic feet.
How much extra should I order?
Add 5 to 10 % for waste and uneven ground.
How many bags of concrete for a 10 ft × 10 ft slab?
A 10 ft × 10 ft slab 4 in thick is 33.3 cu ft. An 80 lb (36 kg) bag of premixed concrete yields about 0.6 cu ft (0.017 m³), so you need about 56 bags, or around 60 with waste. Check the yield printed on your bag, because brands differ.
Related guides
- How much paint do I need for a room?Wall area, doors and windows, coats and coverage, in litres and gallons.
- How to measure a room's square footage (m²) with your phoneLength times width, odd shapes and a m² to sq ft table.
- How accurate are phone measuring apps? What to expect and how to testWhat affects the error, which jobs are fine, and a 20-second test.